THE BASIC PRINCIPLES OF ATS SOCOMEC

The Basic Principles Of ATS Socomec

The Basic Principles Of ATS Socomec

Blog Article

Protection and dependability ATyS p have the two electrical and mechanical interlocks for optimum safety. The 0 place offers electrical safety disconnection and will allow TSE lockout According to IEC60947-three.

Strong, reputable and high undertaking Rated for emergency programs and total technique without derating, these switches also include things like higher limited-circuit ranking with certain breakers or fuses as many as 100 kA.

Excursion functionality ATyS p M contains a purpose for returning on the 0 situation in case of the loss of both energy source resources (tripping). This shields the load from troubles on account of source instability.

Watchdog relay to examine product availability ATyS A items are Outfitted which has a Watchdog relay which continuously monitors your merchandise, therefore securing the set up.

Flexible programming ATyS p M time delays and inputs/outputs are absolutely configurable, therefore enabling the simple checking of particular apps (load shedding, test…) along with the definition of the operating cycle exclusively tailored for your application.

Adaptable Room preserving The ATyS C35 controller might be mounted on either a DIN rail or to your panel door, giving flexibility and optimising Room.

Protected ATyS p M have the two electrical and mechanical interlocks for optimum stability. Additionally they function a positive split indicator, confirming switch posture with dual mechanical indicators for increased protection.

Compact ATSE for easy integration in modular DIN enclosure, tailor made transfer set up and preventive upkeep function

Handheld remote control interface Particularly created for installations where by the item is enclosed, the remote interface shows solution standing within the front panel (D10) or shows and controls with use of programming (D20).

and ATS controller. ATyS A switches provide considerable time saving in the course of commissioning (approach normally takes 2 to 3 minutes). Owing to the design which allows commissioning as a result of 8 DIP switches, a screwdriver is all of that is needed.

Awesome Grid, storage for integrating renewable energy and islanding Paradise, a sensible community for that area people Solenbat optimises the Energetic Vitality efficiency of buildings Stem, energy storage methods for decreased electricity billing Innovation Shut

ATyS p are 3 or 4 pole computerized transfer switches with optimistic crack indication. They integrate all the features made available from the ATyS t and g, along with capabilities designed for electricity administration and functions conversation.

Sử dụng cho hệ thống điện hạ thế khi nguồn cấp phụ tải bị gián đoạn Bộ chuyển mạch tự động, giám sát và chuyển đổi giữa hai nguồn điện Chuyển mạch three vị trí On-Off-On

FR click here Resource library has all the things you would like to assist you to pick out the top electrical power Answer.

For more information on the advantages and capabilities of the C66 controller, make reference to the pertinent webpages.

Report this page